- Letter to CBS Outdoor re: proposed LED sign on Eglinton east of Leslie (PDF)
- Letter to Public Works in support of Eglinton Connects Environmental Assessment Study (PDF)
- Letter in response to Eglinton Connects Planning Study – Final Directions Report (PDF)
- Letter re: Relief Line Project Assessment: Phases 1A-4 (PDF)